[2003] Windpact Advanced Wind Turbine Drive Train Designs Study, 1. ROLNICTWO, OZE Odnawialne źródła energii
[ Pobierz całość w formacie PDF ]
August 2003 • NREL/SR-500-33196
Alternative Design Study
Report: WindPACT Advanced
Wind Turbine Drive Train
Designs Study
November 1, 2000 – February 28, 2002
R. Poore and T. Lettenmaier
Global Energy Concepts, LLC
Kirkland, Washington
National Renewable Energy Laboratory
1617 Cole Boulevard
Golden, Colorado 80401-3393
NREL is a U.S. Department of Energy Laboratory
Operated by Midwest Research Institute
•
Battelle
•
Bechtel
Contract No. DE-AC36-99-GO10337
August 2003 • NREL/SR-500-33196
Alternative Design Study
Report: WindPACT Advanced
Wind Turbine Drive Train
Designs Study
November 1, 2000 – February 28, 2002
R. Poore and T. Lettenmaier
Global Energy Concepts, LLC
Kirkland, Washington
NREL Technical Monitor: A. Laxson
Prepared under Subcontract No. YAM-1-30209-01
National Renewable Energy Laboratory
1617 Cole Boulevard
Golden, Colorado 80401-3393
NREL is a U.S. Department of Energy Laboratory
Operated by Midwest Research Institute
•
Battelle
•
Bechtel
Contract No. DE-AC36-99-GO10337
NOTICE
This report was prepared as an account of work sponsored by an agency of the United States
government. Neither the United States government nor any agency thereof, nor any of their employees,
makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy,
completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents
that its use would not infringe privately owned rights. Reference herein to any specific commercial
product, process, or service by trade name, trademark, manufacturer, or otherwise does not necessarily
constitute or imply its endorsement, recommendation, or favoring by the United States government or any
agency thereof. The views and opinions of authors expressed herein do not necessarily state or reflect
those of the United States government or any agency thereof.
Available electronically at
Available for a processing fee to U.S. Department of Energy
and its contractors, in paper, from:
U.S. Department of Energy
Office of Scientific and Technical Information
P.O. Box 62
Oak Ridge, TN 37831-0062
phone: 865.576.8401
fax: 865.576.5728
email: reports@adonis.osti.gov
Available for sale to the public, in paper, from:
U.S. Department of Commerce
National Technical Information Service
5285 Port Royal Road
Springfield, VA 22161
phone: 800.553.6847
fax: 703.605.6900
email: orders@ntis.fedworld.gov
online ordering:
Printed on paper containing at least 50% wastepaper, including 20% postconsumer waste
Table of Contents
iii
4.8.1
Overview................................................................................................................ 43
4.8.2
Permanent Magnet Generator Design and Construction........................................ 44
4.8.3
Generator Reactance and Optimization for Active and Passive Rectification ....... 46
4.8.4
PM Generator Design and Cost ............................................................................. 47
iv
[ Pobierz całość w formacie PDF ]